Scope of Work
•To design and build a high performance building for on-going JRC programming.
•The new building is 31,000 sq. feet; 50% larger than our original building, maximizing flexible use space. (We would have needed 40,000 sq ft for dedicated spaces!)
South facade, in the evening, showcases our grand two-story staircase.
(Photograph by Steve Hall @ Hedrich Blessing)
Project Costs
•Total project costs including transition and interim fees: $10 million
•Building related costs: $7.4 million
•Estimated up-charge for green initiatives: 3-5% of total project
•HVAC: approximately $250,000 more than conventional, but estimated to be 42-45% more efficient with a payback of 5-7 years. Water usage will bring additional savings.
•We received $105,000 from the Illinois Clean Energy Community Foundation for incremental design, engineering and commissioning for LEED initiative.
Resource Utilization
•Materials: 47% of all the materials used in the building were manufactured within 500 miles. 51% of all new wood used in the building is re-used or is FSC (Forest Stewardship Council) certified.
•Water: The combination of water efficient features in the restrooms and kitchen and drought-resistant landscaping is projected to save 41% on water consumption over the life of the building.
•Energy: The combination of HVAC, lighting, insulation, and other energy saving features of our building is projected to save 45% on energy consumption compared to a conventional building.
Project Team
•Owner: JRC (owner’s representatives – Alan Saposnik, Michael Nolan)
•Architect, Interiors, Lighting Designer: Ross Barney Architects (Carol Ross Barney, Michael Ross, John Fried)
•General Contractor: Bulley & Andrews, LLC
•LEED Consultant: HJKessler Associates (Helen Kessler)
•Mechanical, Electrical and Plumbing Engineer: EYP Mission Critical Facilities
•Commissioning Agent: Cotter Consulting, Inc.
•Structural Engineer: CE Anderson & Associates
•Landscape Architect: oslund.and.assoc.
•Acoustics: Talaske
Support from the JRC Community
•This project could not have happened without the generous financial support of the JRC Community, the support of the JRC Board and the work of the Building Task Force.
•If you would like to make a new pledge or add to your existing pledge, please contact the office and someone from the Capital Campaign will contact you!